I have been downgrading nor consoles in 30 mins
From video opening box to a strip down
Read and flash nor
Build up
Install rogero cfw
Install multiman
Spansion p have been extra 10 mins (flash speed)
The benefit here is now you do not have to wire to test points this was taking at least 10-15 mins and then replacing the clamps and powering 2-3
Then removing wires building back up ect
A new adaptor coming soon !!!! For nor based consoles
From video opening box to a strip down
Read and flash nor
Build up
Install rogero cfw
Install multiman
Spansion p have been extra 10 mins (flash speed)
The benefit here is now you do not have to wire to test points this was taking at least 10-15 mins and then replacing the clamps and powering 2-3
Then removing wires building back up ect
A new adaptor coming soon !!!! For nor based consoles